How Livio helps

Frequently asked questions

Menu

How Livio helps

Who it’s for

Business

More

Your account

All articles

Renovating · 5 min read

New kitchen costs: what belongs in the quote

Compare the complete job, including installation, connections and making the room good again.

RenovatingFinances

The cost of a new kitchen is more than the units and the appliances. The worktop, the installation, the pipework, the electrics and the repair of walls and floor all count.

Take the same wishes and the same details to every kitchen showroom. Then ask what the quote includes. Only once the work matches can you compare the totals properly.

Take the same list of wishes everywhere

Describe the layout, the worktop, the appliances and who does the demolition, the installation, the pipework and the finishing. Take the measurements and photographs with you, using the preparation for the kitchen conversation.

Have the room measured up before you order. A guide price helps you orient yourself, but it is not yet the price of your complete job.

Ask for make, model and the work included

Ask for the make and the model number of every appliance. Two combination ovens need not be the same machine. The model number is what lets you compare the version you chose. Record what happens if that model is no longer available.

Have "installation" written out as well. Fitting units is not the same as running new cables and connecting pipework. The division is in connecting kitchen appliances.

For each excluded item, note who carries out the work, what it costs and when it has to be finished. If pipework is being moved, ask who repairs the wall or the floor afterwards.

ItemWhy it can fall outside the quote
Removing and disposing of the old kitchenTaking it out and taking it away are often a separate service
Moving water, waste and gasInstallation then assumes connections are already in the right place
Consumer unit, extra circuits and cablingThat needs an electrician and sits outside fitting the units
Plastering and making good the wallsDamage and old tiled areas appear once the old kitchen is out
Tiles, splashback and paintingThese are regularly done after the units go in
Repairing the floorUnder old units the floor is sometimes missing or uneven
Extraction ducting or an outside ventThe hood can be included while the ducting is not
Parking, upper floors and awkward accessThese can come back as a surcharge or as extra work
Connecting appliances bought elsewhereThe fitter or supplier can exclude this
Making good after pipeworkMoving a pipe does not automatically include plastering, tiling and painting

Agree in advance how changes are priced

Before you sign, ask how the showroom handles differences in measurements, extra pipework and later changes. Agree any additional work before it is carried out, and record the amount and what it does to the schedule.

The technical preparation is in moving kitchen pipework and extraction. Also match delivery and installation to the floor and the plastering.

Keep the rest of your budget in view

Take the quote home to assess it. A discount that expires is no reason to skip an item you do not understand.

Put the work you already know is missing into your budget separately. And keep a reserve for what only becomes visible after the demolition. The kitchen is part of your renovation, so a more expensive choice has consequences for other rooms and for the rest of your furnishing.

What to do now

  • take the same list to every showroom, so your quotes are comparable
  • ask for the make and the model number of every appliance, not just a category
  • ask what "installation" covers in this particular quote
  • put the additional work you expect into your budget separately
Sources3 sources, 1 of them official

Checked on September 14, 2026. Livio provides information, not personal advice. Ask your adviser, notary or estate agent what applies to you.

Official

  1. 1ACM ConsuWijzer, Paying for extra and reduced work (September 14, 2026)

Trade press

  1. 2IKEA, Included and additional installation work (September 14, 2026)
  2. 3Bruynzeel Keukens, Preparation and pipework advice (September 14, 2026)

Keep reading